检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫宇超 YAN Yuchao(Yitang Coal Industry Co., Ltd. of Shanxi, Jiexiu 032000, Shanxi, China)
机构地区:[1]山西义棠煤业有限责任公司
出 处:《能源与节能》2019年第10期11-15,共5页Energy and Energy Conservation
摘 要:青云煤业21210工作面回风顺槽因受到深井高地应力的影响,采用原支护方案时顺槽出现围岩变形大、破碎等问题。通过分析深井高地应力巷道围岩变形机理,针对采用原支护方案时出现的问题,在原支护方案的基础上提出2种优化支护方案并采用数值模拟方法对2种支护方案进行对比,由数值模拟结果得出方案二为最优方案,并根据矿压监测数据对所选择支护方案的合理性进行了验证。The backwinding trough of the 21210 working face of Qingyun Coal Industry Co., Ltd. was affected by the high ground stress of the deep well, and when the original supporting scheme was adopted, the surrounding rock deformation and fracture occurred. By analyzing the surrounding rock deformation mechanism of the high ground stress roadway in deep well, this paper proposed two optimization support schemes for the problems in adopting the original support scheme, and compared the two support schemes by the numerical simulation method. It was obtained from the numerical simulation results that the second scheme was the optimal scheme, and the rationality of the selected support scheme was verified according to the mine pressure monitoring data.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249