检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨盛 YANG Sheng(PowerChina Guiyang Engineering Corporation Limited,Guiyang550081,China)
出 处:《西北水电》2019年第5期34-38,共5页Northwest Hydropower
摘 要:金沙江昌波水电站厂房置于深覆盖层之上,其基础需要进行处理,才能保证厂房正常运行。处理方法有很多,如换填法、复合地基法等;但是对于地基应力较大的电站,地基承载力也成为一项关键性控制因素,同时还应严格控制沉降量。一般情况下会采用桩的形式对地基进行处理。振冲碎石桩与混凝土灌注桩均可以达到以上效果。计算表明:混凝土灌注桩为最有效、最实用的处理深覆盖层基础处理的方式。The powerhouse of Changbo Hydropower Station in Jinsha River is situated on a deep overburden,and its foundation needs to be treated to ensure the normal operation of the powerhouse.There are many treatment methods,such as the replacement method and the composite foundation method.However,for hydropower stations with large foundation stress,the bearing capacity of the foundation is also a key control factor,and the settlement should also be strictly controlled.In general,the foundation is treated with piles.Both the vibrating gravel pile and the concrete pouring pile can achieve the above-mentioned treatment effects.The calculation shows that the concrete pouring pile is the most effective and practical way for treatment of foundation with deep overburden.
分 类 号:TV223.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91