检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄辉 HUANG Hui(Yalong River Hydropower Development Company,Ltd.Chengdu 610051,China)
机构地区:[1]雅砻江流域水电开发有限公司
出 处:《云南水力发电》2019年第5期120-122,共3页Yunnan Water Power
摘 要:锦屏一级水电站地下厂区地质条件十分复杂,地应力水平较高,岩体强度相对较低,结构性断层发育,局部有煌斑岩脉和节理发育。受复杂地质情况影响,厂房下游拱腰部位出现喷砼层变形开裂掉块,岩体变形破坏现象。为了抑制厂房变形,确保围岩稳定安全,设计提出了针对性加固措施,主要介绍了松弛围岩无盖重条件下固结灌浆施工技术。The geological conditions of underground powerhouse in Jinping I Hydropower Station are very complicated, with high in-situ stress level, relatively low rock mass strength, developed structural faults, and developed lamprophyre vein and joints locally. Due to the influence of complex geological conditions, the shotcrete layer at the downstream of the powerhouse is deformed, cracked, and the rock mass is deformed and damaged. In order to restrain the deformation of the plant and ensure the stability and safety of the surrounding rock, the aim of the reinforcement measures is put forward. This paper mainly introduces the construction technology of consolidation grouting under the condition of no-cover weight.
分 类 号:TV543.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.179