核电厂汽水管道支吊架大纲优化  

Outline Optimization for Support-Hangers of Steam-Water Piping Failure in Nuclear Power Plant

在线阅读下载全文

作  者:付勇[1] 王晓峰[2] 阙家嘉 黄小波 FU Yong;WANG Xiao-feng;QUE Jia-jia;HUANG Xiao-bo(Suzhou Nuclear Power Research Institute Co. Ltd.,Suzhou 215000,China;Daya Bay Nuclear Power Operations and Management Co. Ltd.,Shenzhen 518124,China)

机构地区:[1]苏州热工研究院有限公司,江苏苏州215000 [2]大亚湾核电运营管理有限责任公司,广东深圳518124

出  处:《工程建设与设计》2019年第20期89-91,共3页Construction & Design for Engineering

摘  要:支吊架的状态直接影响管道应力,关系到管道能否安全运行。支吊架大纲是目前核电厂管理支吊架的主要手段,但以目前支吊架运行状态来看,支吊架的管理存在一些不足。论文介绍了目前支吊架的管理现状,阐述了支吊架维修调整和大纲管理优化方法,给出了支吊架大纲优化的合理化建议。The status of support-hangers directly affects the pipeline stress. It is related to whether the pipeline can operation safely. The outline of the support-hangers is the main means of managing the support-hangers of the nuclear power plant. From the current operating status of the support-hangers, the management of the support-hangers have some shortage. This paper introduces the current management status of the support-hangers, explains the method of the adjustment and outline optimization of the support-hangers, provides rationalized suggestions for the outline optimization of the support-hangers.

关 键 词:核电厂 支吊架 管道 大纲 

分 类 号:TM623.4[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象