基于PDCA循环的仪器设备动态管理方法探究  被引量:4

Preliminary Study on Dynamic Management Method of Instrument and Equipment Based on PDCA Cycle

在线阅读下载全文

作  者:陈瑞[1] Chen Rui(Shanxi Agricultural University, Taigu, 030800, China)

机构地区:[1]山西农业大学

出  处:《中国现代教育装备》2019年第19期1-3,8,共4页China Modern Educational Equipment

摘  要:高校仪器设备管理的目的是最大限度地发挥其使用效益,为教学和科研助力。运用项目化管理PDCA循环的过程动态管理方法,在仪器设备生命周期体系的指导下,针对仪器设备管理存在的困难,按照计划、实施、检查、处理与改进四个阶段,明确目标,根据实践中检查出的问题进行纠偏改进,据此循环,不断提高仪器设备的管理水平。The purpose of instrument and equipment management in colleges and universities is to maximize the use of benefits and to help teaching and research. Using the process dynamic management method of project management PDCA cycle, under the guidance of instrument and equipment life cycle system, aiming at the difficulties of instrument and equipment management, according to the four stages of planning, implementation, inspection, processing and improvement, clear objectives, according to practice the problems detected are rectified and improved. According to this cycle, the management level of instrument and equipment is continuously improved.

关 键 词:仪器设备管理 全生命周期 PDCA循环 定期清查 

分 类 号:G647[文化科学—高等教育学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象