检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]燕化公司炼油事业部,北京102503 [2]河北工业大学化工学院,天津300130
出 处:《河北工业大学学报》2002年第5期55-58,共4页Journal of Hebei University of Technology
基 金:国家科技攻关计划资助项目(2001BA32613);国家科技部科技成果重点推广计划资助项目(2001050301)
摘 要:采用新型立体传质塔板对燕山石化炼油事业部的8×105t/年减压渣油催化裂化装置的再吸收塔进行技术改造,新设计塔径为 1200mm,30层CTST塔取代原 1400 mm浮阀塔,改造后C3、C4、C5的吸收率分别提高了60.1%、44.4%、55.1%,年增经济效益294万元.A re-absorbing tower, redesigned with the Combined Trapezoid Spray Tray (CTST), was an important column of the fluidized catalytic cracker unit (FCCU) with 0.8 Mt/a vacuum residuum in the refinery division of Beijing Yanhua Petrochemical company Let. (BYPC). And its diameter was 1 200 mm, with 30 CTST trays. This project had succeeded, and had been making a lot of benefits, that is, the absorbility of C3, C4, C5 was improved by 60.1%, 44.4%, 55.1%, respectively, and its economic effectiveness increased ¥2,940,000 per annum.
关 键 词:立体传质塔板 催化裂化 再吸收塔 吸收率 经济效益 炼油
分 类 号:TE962[石油与天然气工程—石油机械设备] TQ053.5[化学工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198