洪家渡水电站大坝垂直和水平位移计的布置与安装  被引量:1

LAYOUT AND INSTALLATION OF VERTICAL AND HORIZONTAL DISPLACEMENT METERS AT HONGJIADU HYDRAULIC POWER STATION

在线阅读下载全文

作  者:宁国忠[1] 王伟[1] 

机构地区:[1]武警水电一总队二支队,贵州省织金县551500

出  处:《水电自动化与大坝监测》2002年第6期33-36,共4页HYDROPOWER AUTOMATION AND DAM MONITORING

摘  要:洪家渡水电站大坝垂直、水平位移计布置时采用二、三维有限元动静力应力应变分析 ,并与已建大坝工程观测成果相对比 ,布置了 1 1条横向垂直、水平位移计 ,1条纵向垂直、水平位移计。由于对施工干扰影响大 ,洪家渡水电站大坝横向垂直、水平位移计采用了“堆埋法”进行安装 ,结果比较成功。文中介绍了其工艺流程。Vertical and horizontal displacement meters are very important instruments for dam observation. Based on two and three dimensional dynamic and static stress and strain analysis, 11 strips of transverse vertical and horizontal displacement meters and 1 strip of longitudinal vertical and horizontal displacement meters are laid out in the dam body at Hongjiadu Hydraulic Power Station. Because of the influences of construction, a favorable way for installation is extremely necessary. The dump embedded method for installation of transverse vertical and horizontal displacement meters at Hongjiadu Hydraulic Power Station is successful. This paper introduces its technological process, operation and effect.

关 键 词:洪家渡水电站 大坝 布置 安装 垂直位移计 水平位移计 堆埋法 

分 类 号:TV698.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象