杨房沟水电站地下洞群锚索荷载超限控制研究  被引量:2

Study on over-limit control of cables in underground caverns of Yangfanggou hydropower station

在线阅读下载全文

作  者:沈俊良 周勇 SHEN Junliang;ZHOU Yong(PowerChina Huadong Engineering Corporation Limited,Hangzhou 310014,Zhejiang,China;HydroChina-Itasca R&D Center,Hangzhou 310014,Zhejiang,China)

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州310014 [2]浙江中科依泰斯卡岩石工程研发有限公司,浙江杭州310014

出  处:《水利水电技术》2019年第6期93-100,共8页Water Resources and Hydropower Engineering

基  金:国家自然科学基金(U1765206)

摘  要:锚索支护是在地下洞室围岩支护的主要类型之一,出现锚索超限的现象相对普遍。本文基于国内首个采用EPC模式的百万千瓦级水电工程--杨房沟工程,介绍了该地下洞室群的锚索负荷统计情况。为确保该地下洞群施工期及后续运营期的安全,通过对比同类工程的锚索超限比例以及超限锚索的最高超限率,并用离散元法对杨房沟地下洞群锚索进行数值复核分析,对锚索超限情况进行了研究评价,提出了相应超限锚索的安全性控制标准,整体超限比例控制在10%~20%,单根超限率在10%为宜。该锚索超限探讨可对今后的同类工程锚索施作及超限后控制其超限比例及最高超限率提供参考。Cable support is one of the main types of surrounding rock support in underground caverns,and the cables over-limit are common problems in engineering.Based on the Yangfanggou hydropower station which is the first hydropower project with EPC mode in China,the cable load statistics of this underground cavern group is introduced.To ensure the safety of this underground cavern group during the construction period and subsequent operation period,we discuss the cables over-limit and put forward the corresponding safety control standard of cable over-limit comparing with the over-limit ratio and the maximum over-limit ratio of the over-limit cable in similar projects of cables load and numerical analysis carried out by using discrete element method.The overall over-limit proportion should be controlled in the range of 10%~20%,and the over-limit rate of single cable shall be 10%,which can provide a reference for controlling the over-limit ratio and the maximum over-limit rate of cables in similar projects in the future.

关 键 词:地下洞室 锚索支护 锚索超限 离散元数值模拟 

分 类 号:TU45[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象