检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:盘霞[1] 黄强 PAN Xia;HUANG Qiang(Guangxi Transport Vocational and Technical College,Nanning 530023,China;Nanning Survey and Design Institute of Pearl River Commission,Nanning 530007,China)
机构地区:[1]广西交通职业技术学院,南宁530023 [2]广西珠委南宁勘测设计院,南宁530007
出 处:《广西水利水电》2019年第4期64-66,共3页Guangxi Water Resources & Hydropower Engineering
基 金:广西高校中青年教师基础能力提升项目(2019KY1354)
摘 要:介绍了百色市右江百林桥至广州桥段岸坡加固工程的基本情况,分析了该段岸坡稳定的现状。提出岸坡加固方案,加固工程分为3个区域,一、三区采用重力挡土墙加固,二区采用机械钻孔灌注桩加固。An introduction was made on the general information of Bailin bridge-Guangzhou bridge Youjiang River section bank slope reinforcement project in Baise City.The author analyzed the stability status of current bank slope and put forward the reinforcement scheme.The whole project is divided into three areas.Gravity earth retaining wall is designed for No.1 and NO.3 areas,while mechanical bore filling pile is designed for No.2 area.
分 类 号:TV861[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.203.214