作 者:张立辉[1,2] 柴剑雪 乞建勋[1] 熊俊 ZHANG Li-hui;CHAI Jian-xue;QI Jian-xun;XIONG Jun(School of Economics and Management,North China Electric Power University,Beijing 102206,China;Beijing Key Laboratory of New Energy and Low-Carbon Development,North China Electric Power University,Beijing 102206,China;Beijing Electric Power Engineering Co Ltd,Beijing 100054,China)
机构地区:[1]华北电力大学经济与管理学院,北京102206 [2]华北电力大学新能源电力与低碳发展研究北京市重点实验室,北京102206 [3]北京电力工程有限公司,北京100054
出 处:《土木工程与管理学报》2019年第4期8-15,共8页Journal of Civil Engineering and Management
基 金:国家自然科学基金(71271081; 71701069);北京市2017年度科技创新基地培育与发展专项(Z171100002217024)
摘 要:同期延误工期索赔是项目管理中纠纷频出、难以处理的问题,原因是各延误事件对总工期的实际影响无法确定。针对平行工序同期延误问题,首先介绍目前主要的工期索赔方法和同期延误责任归属原则并分析其不足;然后利用总时差、路线长度和总工期的关系研究各延误工序单独推迟总工期的量和总工期实际延误量的关系,从而揭示平行工序同期延误下的总工期延误原理和组合效应规律;以此为基础确定各延误工序对总工期延误的实际影响,得出工期索赔的责任分担比例,提出一种基于时差分析的平行工序同期延误工期索赔方法;最后算例分析表明,该方法能够有效弥补目前常见方法的不足。所提方法能为项目管理人员提供一种平行工序同期延误工期索赔的有力工具。Time claim of concurrent delay is a frequent and difficult problem in project management because the actual impact of every delay event on the total duration cannot be determined.Aiming at parallel activities’concurrent delay,main methods for time claim,principles of responsibility distribution for concurrent delay and their obstacles are analyzed firstly.Secondly,the relationship between the value that each delay postpones total duration alone and the actual delay of total duration are studied using the relationship among total float,length of paths and the total duration,and the principles of construction delay and associative effects in parallel activities’concurrent delay are revealed accordingly.Based on this,the actual impact of every delay event on the total duration and the proportion of responsibility of time claim are determined and a time claim method of parallel activities’concurrent delay based on float theory is proposed.Finally,a case analysis shows that this method can effectively make up for the obstacles of current methods.The method proposed in this paper can provide project managers with a powerful tool for time claim in parallel activities’concurrent delay.
分 类 号:TU723[建筑科学—建筑技术科学]