检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鑫 杨延勇 单金博 LIU Xin;YANG Yan-yong;SHAN Jin-bo(Economic and Technical Research Institute of Liaocheng Power Supply Company,Liaocheng 252000,China)
机构地区:[1]聊城供电公司经济技术研究所
出 处:《电力勘测设计》2019年第8期49-51,69,共4页Electric Power Survey & Design
摘 要:本文针对变电站无功补偿容量设计中常用的估算法,在充分考虑主变轻载运行时的无功缺额特点,采用了一种预测负荷计算方法对其进行优化,提高了无功补偿的设计效果,对今后无功补偿设备的运行具有一定的指导意义。In view of the commonly used estimation method in the design of reactive power compensation capacity of substation,considering fully the characteristics of reactive power shortage in light load operation of main transformer,this paper adopts a load forecasting calculation method to optimize it,which improves the design effect of reactive power compensation,and has certain guiding significance for the operation of reactive power compensation equipment in the future.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49