南水北调穿黄隧洞水质安全保障措施及应用  被引量:2

Safety Measures for Water Quality and Application in Yellow-River-Crossing Tunnel of the South-to-North Water Transfer Project

在线阅读下载全文

作  者:祝亚平 杨育红 ZHU Yaping;YANG Yuhong(Henan Branch,Construction and Administration Bureau of South?to?North Water Diversion Middle Route Project,Zhengzhou 450006,China;College of Water Resources,North China University of Water Resources and Electric Power,Zhengzhou 450046,China;Henan Key Laboratory of Water Environment Simulation and Treatment,Zhengzhou 450002,China;Water Environment Governance and Ecological Restoration Academician Workstation of Henan Province,Zhengzhou 450002,China)

机构地区:[1]南水北调中线干线工程建设管理局河南分局,河南 郑州 450006 [2]华北水利水电大学水利学院,河南 郑州 450046 [3]河南省水环境模拟与治理重点实验室,河南 郑州 450002 [4]河南省水环境治理与生态修复院士工作站,河南 郑州 450002

出  处:《人民黄河》2019年第9期87-91,共5页Yellow River

基  金:国土资源部2015年度开放基金资助项目(FOB201504);河道水污染治理与水生态修复多技术融合、高效协同及应用研究项目(182107000031)

摘  要:穿黄工程是南水北调中线干线标志性输水建筑物,其水面环境与水质安全十分重要。穿黄隧洞进出口水质稳定达到地表水环境质量Ⅱ类标准。漂浮物中有机质的腐败变质会严重危害水质安全,水面漂浮物及时清理成为日常管理的主要工作。针对传统长杆网打捞难度大、操作危险系数高、效率低等缺点,考虑穿黄隧洞工程进口安全栅前汇水区漂浮物种类多、体积大、集中的特点,研制、安装了自动打捞拦污栅;穿黄隧洞工程出口平台作为对外交流和展示南水北调中线工程形象的窗口,与水面落差大,增设了浮排设施,作为日常清理和应急处置水污染突发事件的操作平台,兼具安全和美化环境的效果。The Yellow?River?Crossing Project is a special symbolic water conveyance structure in the middle route of the main canal.Its sce?nic environment surface sensory and water quality safety are equally important.Under the guarantee of the water quality monitoring station net?work designed,the water quality of the inlet and outlet of the tunnel reaches environmental quality standards II for the surface water.The de?terioration of organic matter will seriously endanger the safety of water quality.Floating cleaning should become a part of the daily routine.In view of the shortcomings of traditional long?rod net fishing such as great difficulty,high operational risk factor and low efficiency,and the characteristics of many floating species,large volume and concentration in the catchment area in front of the safety barrier at the entrance of the Yellow?River?Crossing Tunnel Project,an automatic fishing barrier was developed and installed.As an exit platform for the Yellow?River?Crossing tunnel for foreign exchanges and the display of the central line of the South?North Water Diversion Project,it's a big gap from the water,additional flotation facilities were necessary.It provided an operational platform for daily cleaning up and emergency handling of water pollution emergencies,having the effects of security and beautifying the environment.

关 键 词:漂浮物 自动打捞 浮排 南水北调中线工程 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象