高水头坝基裂隙岩体渗流稳定分析  被引量:5

Study on Stability of Fractured Rock Mass of High Head Dam Foundation

在线阅读下载全文

作  者:唐建立 朱翠民 史恒 皇甫泽华 崔保玉 TANG Jianli;ZHU Cuimin;SHI Heng;HUANGFU Zehua;CUI Baoyu(Henan Water Conservancy Survey Co.,Ltd.,Zhengzhou 450008,China;Henan Eastern Henan Water Conservancy Engineering Administration Bureau,Kaifeng 475000,China;Henan Qianping Reservoir Construction Administration Bureau,Zhengzhou 450003,China;Henan Hongda Hydraulic Engineering Co.,Ltd.,Kaifeng 475000,China)

机构地区:[1]河南省水利勘测有限公司,河南郑州450008 [2]河南省豫东水利工程管理局,河南开封475000 [3]河南省前坪水库建设管理局,河南郑州450003 [4]河南宏大水利工程有限公司,河南开封475000

出  处:《人民黄河》2019年第9期123-128,共6页Yellow River

摘  要:随着我国大坝建设高度及坝前蓄水高度的增大,水库蓄水后坝基岩体面临很高的外水压力,势必影响坝基岩体中裂隙在高水头压力作用下的稳定性及渗透性,这关系着整个工程的安全性。根据前坪水库工程坝址区基岩特点,依托渗透破坏理论,通过现场钻孔压水试验结果,对坝基裂隙岩体透水率在水平、垂直等维度的分布情况及曲线类型进行了分析,说明坝址区岩体存在长期渗透破坏的风险。收集施工期坝基裂隙岩体采用的入岩钢筋混凝土防渗墙及帷幕灌浆等工程处理成果,采用数值模拟分析各介质的水力坡降、取样进行室内试验、施工后进行压水试验复核等手段,证明了工程处理措施能有效保证高水头作用下坝基裂隙岩体的稳定,确保了运营期坝基岩体在长期渗透条件下安全稳定。With the increase of dam construction height and the increase of water storage height in front of dam,the dam foundation rock body faces high external water pressure after reservoir impoundment,which will inevitably affect the stability of fractures in dam foundation rock under high head pressure and permeability,which is related to the safety of the entire project.According to the characteristics of bedrock in the dam site area of Qianping Reservoir Project,relying on the theory of seepage failure,through the results of on?site drilling water test,the distribution of water permeability of dam foundation fractures in horizontal and vertical dimensions and its curve types were analyzed,indica?ting the risk of long?term infiltration damage in the rock mass at the dam site.The results of engineering treatments such as reinforced con?crete anti?seepage wall and curtain grouting used in dam foundation fractured rock mass during construction period were collected.Numerical simulation was used to analyze the hydraulic gradient of each medium,indoor sampling test and post?construction water pressure test review.The engineering treatment measures could effectively control the stability of the dam foundation fractured rock mass under the action of high water head and ensured the safety and stability of the dam foundation rock mass under long?term penetration conditions during the operation period.

关 键 词:渗透破坏 高水头 裂隙岩体 压水试验 透水率 前坪水库 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象