预应力施工方法在大型工业物流建筑中的应用  被引量:1

Application of Prestressed Construction Method in Large Industrial Logistics Building

在线阅读下载全文

作  者:傅斌 FU Bin(Sino Spring Asset(Shanghai)Management Limited,Shanghai 200001,China)

机构地区:[1]远泉(上海)企业管理咨询有限公司

出  处:《建筑施工》2019年第8期1453-1455,共3页Building Construction

摘  要:针对大型工业物流建筑建造过程中对工期、成本的控制要求,分析了预应力施工方法在该细分领域的契合度,并从成本、工期方面对比了现浇结构与预应力结构的差异,继而对先张法、后张法2种最具代表性的预应力施工方法进行小结,并提出了相应的建议,以为后续工程开路,亦为类似工程提供参考。In view of the control requirements of construction period and cost in the construction process of large industrial logistics buildings,the fit of prestressed construction methods in this subdivided field is analyzed,and the differences between cast-in-place structure and prestressed structure are compared from the aspects of cost and construction period.Then,the two most representative prestressed construction methods,the pre-tensioning method and the post-tensioning method,are summarized,and corresponding suggestions are put forward to open the way and provide reference for similar projects.

关 键 词:工业物流建筑 预应力结构 先张法 后张法 

分 类 号:TU757.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象