检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张骁雄 任鹏[2] 徐纲[2] ZHANG Xiaoxiong;REN Peng;XU Gang(Zhongyifeng Construction Group Co.,Ltd.,Suzhou,Jiangsu 215131,China;Jiangsu Huning Steel Mechanism Co.,Ltd.,Wuxi,Jiangsu 214200,China)
机构地区:[1]中亿丰建设集团股份有限公司,江苏苏州215131 [2]江苏沪宁钢机股份有限公司,江苏无锡214200
出 处:《建筑施工》2019年第8期1480-1482,共3页Building Construction
摘 要:针对单层曲面网壳钢结构屋面的工程特点,将网壳屋面分成三大部分,采取了分区分块对称安装、设置合理的合拢区域、分区同步卸载并对卸载过程进行监测等方法,确保了单层曲面网壳钢结构屋面的施工质量,从而顺利地完成了网壳钢结构屋面的安装。According to the engineering characteristics of single-layer curved reticulated shell steel roof,the reticulated shell roof is divided into three parts,and the method of symmetrical installation of partitions,reasonable setting of closed area,simultaneous unloading of partitions and monitoring of unloading process are adopted to ensure the construction quality of the single-layer curved reticulated shell steel structure roof so as to successfully complete the installation of the reticulated shell steel structure roof.
分 类 号:TU758.15[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222