检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘新 王纪锋[3] 马殿光 乐培九[2] LIU Xin;WANG Jifeng;MA Dianguang;YUE Peijiu(State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China;Tianjin Research Institute for Water Transport Engineering,M.O.T.,Tianjin 300456,China;Maritime Administration of Henan Provincial Transportation Bureau,Zhengzhou 450016,China)
机构地区:[1]天津大学水利工程仿真与安全国家重点实验室,天津300072 [2]交通运输部天津水运工程科学研究所,天津300456 [3]河南省交通运输厅航务局,河南郑州450016
出 处:《河海大学学报(自然科学版)》2019年第5期477-481,共5页Journal of Hohai University(Natural Sciences)
摘 要:为解决航道整治线宽度理论公式求解过程中假定工程前后参数不变产生的计算误差,提出一种确定整治线宽度的新方法。该方法从河流水流运动、泥沙运动以及河床形态机理出发,通过理论研究,推导了持续冲刷状态下和输沙平衡状态下航道整治线宽度的计算公式,并利用整治效果良好的实际工程进行验证。结果表明:新方法可以规避工程前后相关参数的取值问题;与已有大多数方法相比较,新方法确定的整治线宽度与实际工程应用值最为接近,验证了该方法的可行性。At present,the theoretical formulas for determining the width of waterway regulation lines were mostly solved by establishing a certain relationship between the flow and sediment conditions before and after the project.Many parameters were involved in these formulas,and in the solving process,it was usually assumed that value of part parameters in the formula is the same before and after the project.However,some changes may occur before and after the project,affecting the accuracy of the width of regulation lines.In order to avoid errors caused by this assumption,a new method to determine the width of waterway regulation lines was proposed.Based on the mechanism of flow movement,sediment movement and river bed topography,two determining methods for the width of waterway regulation lines under continuous scouring condition and sediment transport equilibrium condition were put forward by theoretical study,and the proposed methods were verified by practical projects with good regulation effect.The results show that the proposed methods have good engineering results,and compared with most existing methods,the width of the regulation lines determined by the new method is the closest one to the actual value of engineering project,which can provide a good theoretical support for waterway regulation projects.
关 键 词:航道整治 浅滩 整治线宽度 计算公式 持续冲刷 输沙平衡
分 类 号:U617[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.232.226