作 者:曾迎峰 ZENG Yingfeng(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou Henan 450000)
机构地区:[1]中国水利水电第十一工程局有限公司
出 处:《河南科技》2019年第20期55-57,共3页Henan Science and Technology
摘 要:赞比亚慕松达水电站为修复扩容工程,将原有的5台1MW卧式水轮发电机组升级为1.1MW,再新增2台2.25MW的卧式水轮发电机组,最终使电站的装机容量达到10MW。老厂房的1#~5#机组设计额定水头为29.4m,新建厂房的6#、7#机组设计额定水头为29.2m。本文就该工程的卧式水轮发电机组安装进行总结,为类似设备安装提供借鉴。In order to repair and expand the capacity of Musonda Hydropower Station in Zambia,the original 5MW horizontal hydro-generating units were upgraded to 1.1MW,and two 2.25MW horizontal hydro-generating units were added,which finally made the installed capacity of the station reach 10MW.The design rated water head of 1#~5#units in old plant is 29.4m,and that of 6#and 7#units in new plant is 29.2m.This paper summarized the installa?tion of horizontal hydro-generating units in this project,and provided reference for similar equipment installation.
分 类 号:TV547.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112