检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:符亚鹏[1,2] FU Yapeng(China Railway First Survey And Design Institute Group Co.,Ltd.,Xi'an 710043,China;Shaanxi Railway and underground Traffic Engineering Key Laboratory(FSDI),Xi'an 710043,China)
机构地区:[1]中铁第一勘察设计院集团有限公司 [2]陕西省铁道及地下交通工程重点实验室(中铁一院)
出 处:《铁道标准设计》2019年第9期74-77,共4页Railway Standard Design
基 金:中国铁建股份有限公司科技研究开发计划(16-C52);中铁第一勘察设计院集团有限公司科技研发计划项目(院科17-15,院科17-20)
摘 要:结合膨胀性地层铁路隧道病害概况以及单、双线铁路隧道断面、防排水设计现状,提出相应的衬砌结构及防排水措施优化建议。衬砌结构的优化建议如下:对单线隧道而言,适当增大其边墙曲率、仰拱矢跨比,提高边墙、仰拱的强度和刚度;对双线隧道而言,适当增大其仰拱矢跨比,提高仰拱的强度和刚度;隧道仰拱处二次衬砌应采用钢筋混凝土,同时在隧道仰拱填充中增设格栅钢架或在隧道仰拱填充顶部增设钢筋。防排水措施的优化建议如下:将设置在仰拱填充内的中心水沟下移至仰拱下方,在仰拱下方设中心水沟或改设为排水渗沟,可将隧道衬砌背后积水均引入仰拱下方的中心水沟排出洞外;而改设的中心渗沟主要用于排出仰拱下方积水。Based on the defect condition of the railway tunnel in the swelling stratum,the tunnel section and present design conditions of the structure shape,waterproof and drainage measures for single-track and double-track railway tunnels,some suggestions for optimization of lining structures and drainage measures are proposed.Some optimization suggestions on the lining structure are as follows:for the single-track tunnel,the curvature of the sidewall and the rise-span ratio of the tunnel invert should be increased properly and the strength and rigidity of the sidewall and tunnel invert should be improved.Similarly,for the double-track tunnel,the rise-span ratio of the tunnel invert should be properly increased to improve the strength and rigidity of the tunnel invert.Besides,the steel frame in the invert filling or the steel bar in the roof of the invert filling should be increased and reinforced concrete should be applied in the invert of the secondary lining.The optimization suggestion on the waterproof and drainage measures are as follows:the center ditch in the invert filling should be moved to a lower position in order to gather the water behind the tunnel lining into the central ditch,and the drainage trench below the tunnel invert should be constructed to drain the water below the tunnel invert.
关 键 词:铁路隧道 膨胀性地层 衬砌结构 防排水措施 优化
分 类 号:U451[建筑科学—桥梁与隧道工程] U452[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.2.200