检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁慧峰 DING Huifeng(Shanxi Baiyekou Reservoir Construction Administration Bureau,Taiyuan 030002,China)
机构地区:[1]山西省柏叶口水库建设管理局,山西太原030002
出 处:《中国水能及电气化》2019年第8期1-8,共8页China Water Power & Electrification
摘 要:探究柏叶口水库泄洪发电洞水流挑距产生较大偏差的原因,可针对性地对泄洪发电洞进行出口挑流消能。文章对其泄洪发电洞下泄水流的流态、受力情况、紊动掺气特性等进行了分析,得出结论:挑距产生偏差的原因主要是水流的掺气减阻效应和离心惯性力的影响。The causes of the large deviation in jettrajectory length of the flood-discharge power tunnel in Baiyekou Reservoir.The outlet flow diversion and energy dissipation are implemented in the flood-discharge power tunnel specially.The flow regime,stress condition,turbulence aeration characteristics of the discharge water in the flood-discharge power tunnel are analyzed in the paper.The following conclusion is obtained:the main reason of the deviation of jettrajectory length is the influence of water flow aerated dragreduction effect and centrifugal inertia force.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.218