检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:文仕军 张红强 周殿喜 WEN Shi-jun;ZHANG Hong-qiang;ZHOU Dian-xi(Sinohydro Bureau 14 Corporation Limited,Kunming 650041,Yunnan)
机构地区:[1]中国水利水电第十四工程局有限公司
出 处:《云南水力发电》2019年第A01期61-65,共5页Yunnan Water Power
摘 要:根据斯里兰卡Kaluganga水库首部工程土料场分布情况,按不同天气条件、不同施工阶段对不同地理位置土料场的心墙黏土料的质量、储量需求进行调查分析,据此进行土料场的勘探、开采规划,一方面保证心墙黏土料的质量,另一方面,保证大坝心墙填筑施工时心墙黏土料的供应强度满足进度需求。According to the distribution of soil material yard in the first project of Kaluganga Reservoir in Sri Lanka, the quality and reserves of core clay material in different geographic locations are investigated and analyzed according to different weather conditions and construction stages. Based on this, the exploration and mining plan of the core clay material yard is carried out. On the one hand, the quality of core clay material is guaranteed, and on the other hand, the supply strength of clay materials for dam core wall during filling construction is ensured to meet the schedule demand.
分 类 号:TV223.4[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28