拱坝新老混凝土结合面处理技术措施  被引量:2

Technical Measures for Treatment of New-Old Concrete Interface of Arch Dam

在线阅读下载全文

作  者:熊图耀 XIONG Tuyao(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning,Guangxi,530007)

机构地区:[1]中国能源建设集团广西电力设计研究院有限公司

出  处:《红水河》2019年第5期5-9,共5页Hongshui River

摘  要:笔者介绍了万家口子碾压混凝土拱坝新老混凝土结合面的处理,通过外观质量及内部监测成果对已浇筑坝体进行质量检查,根据已浇筑坝体的实际情况和拟定的浇筑计划、温控措施,采用三维瞬态有限元法对施工全过程进行温度场及温度应力仿真计算分析研究,在此基础上拟定相应的层间处理技术措施。监测资料表明,这些处理措施效果良好。The author introduces the treatment of new-old concrete interface of Wanjiakouzi RCC arch dam,inspects the quality of the poured dam body through the appearance quality and internal monitoring results,and uses the three-dimensional transient finite element method to simulate and analyze the temperature field and temperature stress during the whole construction process according to the actual situation of the poured dam body and the proposed pouring plan and temperature control measures.On this basis,the corresponding interlayer treatment technical measures are worked out.Monitoring data show that these measures are effective.

关 键 词:拱坝 新老混凝土结合面 碾压混凝土 处理 监测 

分 类 号:TV544.921[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象