北盘江马马崖一级水电站厂房尾水水位流量关系复核  

Review of Tailwater Stage-Discharge Relation of the Power House of Mamaya I Hydropower Station in Beipanjiang

在线阅读下载全文

作  者:望建成 WANG Jiancheng(PowerChina Guiyang Engineering Corporation Limited,Guiyang,Guizhou,550081)

机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司

出  处:《红水河》2019年第5期41-43,47,共4页Hongshui River

摘  要:北盘江马马崖一级水电站于2015年6月投产运行,为复核电站厂房尾水水位流量关系及对发电量影响,对下游河道断面进行实测并分析淤积变化,根据其下游马马崖二级坝址水位站拟定的天然水位流量关系,采用伯努利方程复核计算马马崖一级水电站厂房水位流量关系,复核分析发现厂房尾水中低水段较原可研设计时明显抬高,马马崖一级水电站的发电量略有减小,但不影响厂房防洪安全。Mamaya I Hydropower Station in Beipanjiang was put into operation in June 2015.In order to check the tailwater stage-discharge relation of hydropower house and its impact on electricity production,the downstream river section was measured and the siltation changes were analyzed.According to the natural stage-discharge relation drawn up by the water level station at the dam site of Mamaya II Hydropower Station,the stage-discharge relation of the powerhouse of Mamaya I Hydropower Station is calculated by using Bernoulli equation.The review analysis shows that the low water section in the tailwater of the powerhouse is obviously higher than that of the original feasibility study design,and the electricity production of Mamaya I Hydropower Station is slightly reduced,but it does not affect the flood control safety of the powerhouse.

关 键 词:马马崖一级水电站 厂房尾水 水位流量关系 发电量 

分 类 号:P333[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象