阳江海上风电220kV海缆施工技术研究  被引量:3

Research on Construction Technology of 220kV Cable for Yangjiang Offshore Wind Power

在线阅读下载全文

作  者:李思佳 Li Sijia(China Energy Construction Guangdong Thermal Power Engineering Co.,Ltd.,Guangzhou Guangdong,510735)

机构地区:[1]中国能源建设广东火电工程有限公司

出  处:《电子测试》2019年第20期70-72,共3页Electronic Test

摘  要:广东阳江沙扒海上风电场一期试点项目220kV送出海缆由海上升压站至陆上集控中心的送出海缆采用电压等级为220kV的双回三芯海缆。主要包含2回路的220kV送出海缆敷设、海缆登陆、陆上锚固井、陆上接头井等施工技术。介绍了项目工程概况,分析了施工存在的影响因素以及施工过程采用的关键技术,制定了详细的施工方案和管理措施,确保了整体施工工艺要求和质量。The 220 kV outgoing cables for the pilot project of the first phase of the Shapi offshore wind farm in Yangjiang,Guangdong Province,from the offshore booster station to the onshore centralized control center are double-circuit three-core cables with a voltage level of 220 kV.Mainly includes the construction technology of 220 kV outgoing submarine cable laying,submarine cable landing,land anchoring well,land joint well and so on.This paper introduces the general situation of the project,analyses the influencing factors in the construction and the key technologies adopted in the construction process,and formulates the detailed construction plan and management measures to ensure the overall construction process requirements and quality.

关 键 词:海上风电 项目管理 220kV海底光缆 埋设技术 

分 类 号:TU7[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象