检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨洋 Yang Yang(No.1 Exploration Team of Coalfield Geology Bureau,Huainan,Anhui 232052)
机构地区:[1]安徽省煤田地质局第一勘探队
出 处:《江西煤炭科技》2019年第4期43-46,共4页Jiangxi Coal Science & Technology
摘 要:为提高煤层回采上限,解放呆滞煤量和煤层安全开采,基于顾桥煤矿北二采区的地质工作,分析承压松散层含水层下覆岩破坏特征,查明工作面“两带”发育高度,最终确定:I类区块留设60~100 m安全煤岩柱,Ⅱ类区块留设20~40 m安全煤岩柱。按淮南煤田部分矿区常规防水煤岩柱80 m留设比较,Ⅱ类区块缩小40~60 m防水煤岩柱,初步估算解放呆滞煤量约1.80 Mt。In order to improve the coal seam upper extraction limit,liberate the sluggish coal and safe mining of coal seams,based on the geological work of No.2 mining area in Guqiao Colliery,the paper analyzes the failure characteristics of the overlying strata under the confined loose aquifer and finds out the development height of the“two zones”of the working face.It also determines that 60~100 m safe coal and rock columns are reserved for the I-type blocks,and 20~40 m safe coal and rock columns are reserved for the II-type blocks.According to the 80 m of conventional waterproof coal-rock columns in some mining areas of Huainan coalfield,the II-type blocks are reduced by 40~60 m waterproof coal pillars,and the estimated liberation of stagnant coal is about 1.80 Mt.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.34.36