检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘兴宗 唐春安[1] 孙润 LIU Xing-zong;TANG Chun-an;SUN Run(State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian116023,China;School of Civil Engineering,Ludong University,Yantai264003,China;Institute of Sea-Crossing Engineering,Ludong University,Yantai264003,China;Yantai Institute of Metrology,Yantai264003,China)
机构地区:[1]大连理工大学海岸和近海工程国家重点实验室,辽宁大连116023 [2]鲁东大学土木工程学院,山东烟台264003 [3]鲁东大学跨海工程研究院,山东烟台264003 [4]烟台市计量所,山东烟台264003
出 处:《长江科学院院报》2019年第11期104-109,共6页Journal of Changjiang River Scientific Research Institute
基 金:国家自然科学基金国家重大科研仪器研制项目(51627804)
摘 要:为研究蓄水期大岗山水电站右岸边坡抗剪洞的加固机理和加固效果,首先根据微震监测结果分析了蓄水过程中抗剪洞及周围岩体的微震活动性,圈定了蓄水期右岸边坡内部主要损伤区域;然后利用真实破裂过程分析方法(RFPA)模拟蓄水过程,得到了蓄水过程中边坡的应力场、位移场,对抗剪洞在蓄水过程中的微震活动性作出解释;最后,利用数值模拟方法分析了蓄水过程中抗剪洞的加固作用机理,评价了抗剪洞加固措施在蓄水过程中的加固效果。研究表明:抗剪洞能够提高边坡的抗剪能力,但随着其布设的高程降低,这种加固效果越来越弱;蓄水过程中,抗剪洞表现出了宏观剪切、微观拉裂的破坏形式。The mechanism and effectiveness of reinforcing the right bank slope of Dagangshan hydropower station by replacing weak zones with anti-shear galleries during water storage are investigated.According to microseismic monitoring,the major damage regions in the right bank slope are identified;microseismic activities concentrates in the vicinity of anti-shear galleries at 1 240 m,1 210 m,1 180 m,and 1 150 m,mainly induced by tention fractures.Moreover,the stress field and displacement field during impounding are obtained by numerical simulation in RFPA(realistic failure process analysis)code to explain the microseismic activities of anti-shear galleries:stress concentration and failure are prone to occur around the anti-shear galleries which is in tension state.In association with the numerical results together with the microseismic-monitoring data,macro-shear and micro-tension are found to be the failure mode of anti-shear galleries.In the early stage of impounding,anti-shear gallery affects the stress distribution in the bank slope,and refrains from penetrative plane of fracture.Meanwhile,anti-shear gallery could enhance the anti-shear ability of bank slope;however such effect attenuates with the decline of elevation.In general,anti-shear galleries are conducive to the stability of bank slope during impoundment.
关 键 词:抗剪洞 加固效果 微震监测 数值模拟 蓄水 大岗山水电站
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.25.158