检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张国权[1] 廉立虎[1] 张慈珩[2] Zhang Guoquan;Lian Lihu;Zhang Ciheng(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China;Tianjin Research Institute for Water Transport Engineering,M.O.T.,Tianjin 300456,China)
机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222 [2]交通运输部天津水运科学研究院,天津300456
出 处:《港工技术》2019年第5期17-20,共4页Port Engineering Technology
摘 要:本文全面系统地分析了天津某LNG项目配套码头工程取水口项目两个方案的形成过程、选择条件及优缺点,并详细地介绍了大开挖加桩基形成取水口管涵复合地基的设计要点及现场施工情况,为水运工程类似项目的实施提供了借鉴。A comprehensive and systematic analysis of two water intake plans for a Tianjin LNG terminal is made from the aspects of formation,application conditions,advantages and disadvantages.An introduction to the design essentials and field construction situation is made in detail,which covers the composite foundation of water intake pipe culvert produced by combining large-size excavation with pile foundation.The research results will provide a reference for similar projects.
关 键 词:LNG码头 接收站 取水口 管涵 大开挖 围埝 复合地基
分 类 号:U656.1[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.145.122