安拉沟水库工程整体式面板坝施工分析  

Analysis of Integral Face Dam Construction in Anlagou Reservoir Project

在线阅读下载全文

作  者:王超 WANG Chao(Hami Water Conservancy and Hydropower Project Quality Supervision Station,Hami,Xinjiang,839000,China)

机构地区:[1]哈密市水利水电工程质量监督站,新疆哈密839000

出  处:《水电科技》2019年第4期75-77,共3页Hydroelectric Science & Tecnology

摘  要:安拉沟水库坝体迎水面面板分为主坝整体式钢筋砼面板和副坝分离式面板。文章结合笔者工作经验及该水库的实际情况,分析了水库工程整体式面板坝的设计参数,然后给出了详细的施工程序,包括面板分期施工及面板分缝技术交底两个部分,并提出了施工要求和出现面板浇筑缺陷时的具体补救措施,最后制定了安全防范措施,从而为今后更好的开展同类工作提供有效的参考。Upstream panel of Anlagou reservoir dam is divided into integral reinforced concrete face of main dam and separated face of auxiliary dam.Based on author's working experience and actual situation of reservoir,this paper analyzes design parameters of integral face dam of reservoir project,and then offers detailed construction procedure,including two parts of panel staged construction and technical disclosure of panel split joint,and puts forward construction requirements and specific remedial measures in case of defects of panel pouring.Finally,it formulates safety precautions in order to provide effective reference for better development of similar work in future.

关 键 词:整体式面板坝 施工程序 安全措施 

分 类 号:TV64[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象