检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赖洪涛 林斯嘉 方小丹 Lai Hongtao;Lin Sijia;Fang Xiaodan(Architectural Design&Research Institute of SCUT Co.,Ltd.,Guangzhou 510641,China)
机构地区:[1]华南理工大学建筑设计研究院有限公司
出 处:《建筑结构》2019年第20期1-7,共7页Building Structure
摘 要:贵阳世界贸易中心A塔楼,结构总高度381m,应用内置钢棒的钢筋混凝土框架柱和内置钢管的钢筋混凝土核心筒,形成密柱框架-核心筒结构;针对其“下大上小”的体型,外围采用缓倾斜的外框柱、内部以斜墙过渡实现核心筒向上缩小。对此超高的密柱框架-核心筒结构进行整体和专项的详细分析,作为刚度控制指标的整体稳定满足要求,抗震性能化设计满足规范要求。Tower A of Guiyang World Trade Center has a total structural height of 381m,and it adopts the dense column frame-corewall structural system by using reinforced concrete frame column with built-in steel rods and reinforced concrete corewall with built-in steel tubes.In view of its shape with“larger lower part and smaller upper part”,the plane size of the corewall is reduced upward by gently inclined outer frame column and inclined wall transition in the interior.The whole and special detailed analysis of this super high-rise frame-corewall structure was carried out.As a stiffness control index,the overall stability meets the requirements,and the seismic performance design meets the requirements of the code.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200