检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲍伟伟 Bao Weiwei(China Nuclear Power Operation Technology Corporation,LTD.,Zhejiang Branch,Zhejiang,Haiyan,314300,China)
出 处:《仪器仪表用户》2019年第12期48-50,38,共4页Instrumentation
摘 要:本文对国内新建压水堆核电厂调试阶段核仪表系统(RPN)遇到的几个典型问题,包括引发反应堆非计划停堆的事件和试验不合格的事件进行了分析阐述;分析了核仪表系统引发非计划停堆以及设计接口不匹配的根本原因,并提出了相应的改进方案,对同类型的电厂具有一定的借鉴价值。In this paper,several typical problems encountered in the commissioning phase of the nuclear instrument system(RPN)of the newly built pressurized water reactor nuclear power plant in China,including the unplanned shutdown of the reactor and the unqualified test,are analyzed and expounded.In this paper,the fundamental causes of unplanned shutdown and mismatch of design interfaces caused by nuclear instrumentation system are analyzed,and corresponding improvement schemes are put forward,which have certain reference value for similar power plants.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229