检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆秋平 周吉 陆陈华 LU Qiuping;ZHOU Ji;LU Chenhua(Shanghai Construction No.7(Group)Co.,Ltd.,Shanghai 200050,China)
机构地区:[1]上海建工七建集团有限公司
出 处:《建筑施工》2019年第10期1792-1794,共3页Building Construction
摘 要:以上海临港科技创新城A0202地块项目为例,研究了SMW(水泥土搅拌桩墙)工法桩+前撑式注浆钢管桩组合工艺应用于砂质粉土地区基坑围护结构的可行性,介绍了施工期间对前撑式注浆钢管桩施工工艺的改进,以期为相似地基条件下基坑围护结构的设计和施工提供参考。Taking the A0202 block project of Shanghai Lingang Science and Technology Innovation City as an example,this paper studies the feasibility of SMW(cement-soil mixing wall)construction method pile+front-braced grouting steel pipe pile composite process applied to foundation pit retaining structure in sandy silt area,and introduces the improvement of construction technology of front-braced grouting steel pipe pile during construction,which can provide references for the design and construction of the retaining structure of the foundation pit in similar foundation condition.
关 键 词:基坑围护 砂质粉土层 前撑式注浆钢管桩 SMW工法
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15