攀钢钒4~#高炉汽动鼓风机组改造方案研究与建议  

Research and Suggestion on the Transformation Scheme of the No.4 Blast Furnace Steam Blower in Panzhihua Steel

在线阅读下载全文

作  者:赵必刚 吕勇 刘子成 ZHAO Bigang;LU Yong;LIU Zicheng(Energy Power Branch of Panzhihua Steel vanadium Co.,Ltd.,Panzhihua,Sichuan 617000,China)

机构地区:[1]攀枝花钢钒有限公司能动分公司

出  处:《冶金动力》2019年第12期66-69,共4页Metallurgical Power

摘  要:通过分析4#高炉需求风量、风压,计算出鼓风机轴功率,再比较分析汽动鼓风方案与电动鼓风方案,电动鼓风方案明显优于汽动鼓风方案。由此建议在现电动鼓风站旁新建一台电动鼓风机组为4#高炉送风。Through analysis of the No.4 blast furnace demand for air volume and air pressure,the shaft power of the blower was calculated,and then the schemes of steam blast and electric blast are compared and analyzed to find that electric blast mode was obviously better than steam blast.Therefore,it was suggested to build a new electric blower beside the current electric blower station to supply air for the No.4 blast furnace.

关 键 词:高炉鼓风 研究 改造方案 建议 

分 类 号:TH44[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象