绿色模板技术在南宁华润中心东写字楼项目施工中的应用  被引量:2

Application of Environmentally Friendly Formwork System in Nanning Huarun Center East Office Building Project Construction

在线阅读下载全文

作  者:薛庆[1] 刘东 王惊雷 张元植 李骏 XUE Qing;LIU Dong;WANG Jinglei;ZHANG Yuanzhi;LI Jun(Sichuan Huaxi Group Co.,Ltd.,Chengdu,Sichuan 610081,China)

机构地区:[1]四川华西集团有限公司

出  处:《施工技术》2019年第20期23-25,共3页Construction Technology

摘  要:结合南宁华润中心东写字楼项目核心筒施工实践,对绿色模板技术设计原则进行探讨,提出应采取模数式工具式模板、优化模板结构设计和优化模板悬吊方式等设计原则;经分析对比,采用模数式标准钢模板、模数式非标钢模板、模数式可调补缝钢模板和活动铰接钢角模;介绍模板定位悬挂技术、滚轮小车调整技术、活动铰接角模、可调模数钢模板等绿色模板应用技术。Combined with the construction practice of the core tube of the east office building project of Nanning Huarun Center,this paper discusses the design principles of green formwork technology,and puts forward the design principles of modular formwork,tool formwork,optimized formwork structure design and optimized formwork suspension mode.Through analysis and comparison,modular standard steel formwork,modular non-standard steel formwork,modular adjustable joint steel formwork and movable hinged steel angle formwork are adopted.This paper introduces the application technology of green formwork,such as formwork positioning and suspension technology,roller car adjustment technology,movable hinge angle formwork,adjustable module steel formwork.

关 键 词:高层建筑 混凝土 核心筒 模板 环保 绿色施工 

分 类 号:TU745.1[建筑科学—建筑技术科学] TU755.2

 