检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛周浩 XUE Zhou-hao(Zhongyifeng Construction Group Co.,Ltd,Suzhou Jiangsu215131 China)
机构地区:[1]中亿丰建设集团股份有限公司
出 处:《江苏建筑》2019年第5期73-74,98,共3页Jiangsu Construction
摘 要:墙体抹灰阶段的质量通病主要是空鼓、开裂等问题,可以通过抹灰面层压入玻纤网来控制开裂现象,抹灰层空鼓问题是目前住宅类项目的业主、物业、施工各方最为关注的问题,也是使用水泥砂浆抹灰无法完全杜绝的难题,文章从为了实现降低空鼓率的目的出发,结合现场实际以及气候特点,应用基层拍浆工艺原理,通过粉刷各个阶段的质量控制措施,达到了降低粉刷空鼓率的目标,为了使得效果可控、真实,在项目全面推广,综合全项目数据,总结了“基层拍浆工艺,对降低抹灰层空鼓的效果良好”的结论。The common quality problems in the wall plastering stage are mainly hollow drums,cracking and so on,the cracking phenomenon can be controlled by laminating the plaster surface into the glass fiber mesh,the problem of the plastering layer is the current owner of the residential project,the most concerned issues of the property and construction parties are also the problems that can not be completely eliminated by the use of cement mortar.In order to achieve the goal of reducing the empty drum rate,this paper combines the actual conditions of the site with the local climate characteristics,applying the principle of the base layer pulverization process.Through the quality control measures at various stages of painting,the goal of reducing the emptying rate of the brushing was achieved.In order to make the effect controllable and real,the project was comprehensively promoted,and the whole project data was comprehensively summarized,summarizing the“basic layering process,reducing the plastering layer”.The conclusion that the effect of the empty drum is good.
分 类 号:TU754.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.250.99