检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田业军 龙起煌 张毅 TIAN Ye-jun;LONG Qi-huang;ZHANG Yi(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出 处:《价值工程》2019年第33期180-181,共2页Value Engineering
摘 要:为控制老挝Nam Khan 2面板堆石坝工程投资,在详细设计阶段通过抬高趾板基础崁深、采用斜趾板结构、调整趾板内坡开挖的三项优化措施,减少了石方开挖约30万m^3,为大坝节省了上千万投资,对工程投资和工期的控制起到了重要作用。In order to control the investment of Nam Khan 2 concrete faced rockfill dam in Laos,In the detailed design stage,three optimization measures were adopted,such as raising the foundation of the toe plate embedded deep,using the inclined toe plate structure,and adjusting the excavation of the inner slope of the toe plate,which reduced the rock excavation by about 300,000 m^3,saved tens of millions of investment for the dam and played an important role in the project investment and period control.
关 键 词:面板堆石坝 趾板 优化设计 NAM KHAN 2
分 类 号:TV642.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15