检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张强[1] 曾开帅 张宇[1] 何文君 邵江[2] 彭琪 ZHANG Qiang;ZENG Kaishuai;ZANG Yu;HE Wenjun;SHAO Jiang;PENG Qi(Chengdu University of Technology,Chengdu610059,China;Sichuan Provincial Transport Department Highway Planning,Survey,Design And Research Institute,Chengdu610041,China)
机构地区:[1]成都理工大学,成都610059 [2]四川省交通运输厅公路规划勘察设计研究院,成都610041
出 处:《南水北调与水利科技》2019年第5期166-171,共6页South-to-North Water Transfers and Water Science & Technology
基 金:国家自然科学基金(41472275);四川交通科技项目(2013C10-2)~~
摘 要:大型隧道涌水常发生于岩溶发育地区,在传统认为缺水、贫水的红层地区实属罕见。飞仙关隧道作为雅康高速公路关键性控制工程之一,在施工至K23+708标段时发生特大涌突水,涌水量高达1.74×10^6 mL/s,经过一个周期性涌水,稳定流量约为3.48×10^5 mL/s。以飞仙关隧道为例,结合前人对隧道涌水的水化学分析成果,采用自主研发的专门用于模拟隧道涌水过程的渗流试验槽装置,将飞仙关隧道K23+658~883段(225m)原型按一定比例缩小为模型,选取飞仙关向斜两个典型剖面进行物理模拟试验。通过对试验涌水量的拟合分析,对比隧道实测涌水特征,验证了顺层顺轴向、顺层绕轴向两种涌水模式,确定了涌水来源与通道。试验结果表明该模型稳定可靠,研究方法及结果对今后类似工程的研究具有指导和借鉴意义。Water inrush from large tunnels often occurs in Karst areas,which are rare in red layers where water is traditionally considered to be poor.As one of the key control projects of Yakang Expressway,Feixianguan Tunnel has a huge water inrush when it reaches the K23+708 tender section.The water inrush volume is up to 1.74×10^6 mL/s.After a periodic water inrush,the steady flow is about 3.48×10^5 mL/s.Taking the Feixianguan tunnel as an example,this paper combines the previous results of hydrochemical analysis of water gushing in the tunnel,using the self-developed percolation test slot device,which was specially used to simulate the process of tunnel water gushing,the prototype of K23+658~883 segment(225 m)of Feixianguan tunnel to a certain proportion as a model,and two typical sections of Feixianguan syncline were selected for physical simulation test.Through the fitting analysis of the test water inflow and the comparison of the characteristics of the measured water gushing in the tunnel,two kinds of water inrush modes of along the axis and around the axis were verified,and the source and channel of the water gushing were determined.The experimental results showed that the model was stable and reliable,and the research method and results may use as guidance and reference for the future research of similar projects.
分 类 号:U455[建筑科学—桥梁与隧道工程] P642[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222