检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李建秋 Li Jian-qiu
出 处:《电力系统装备》2019年第18期220-221,共2页Electric Power System Equipment
摘 要:随着国内抽水蓄能电站的兴起,高压引水隧洞技术在蓄能电站得到了广泛应用,隧洞的结构安全问题也越来越被关注.虽然在设计、施工及试验阶段,通过相应的数值计算与试验数据分析可认证隧洞的结构安全性及合理性,但是,高压引水隧洞投入运行后的真实状况仍需相应的监测方法来揭示,从而对结构性态是否正常做出判断.With the rise of domestic pumped storage power stations,high-pressure diversion tunnel technology has been widely used in energy storage power stations,and the structural safety of tunnels has become more and more concerned.Although,in the design,construction and test stages,the structural safety and rationality of the tunnel can be verified by the corresponding numerical calculation and test data analysis.However,the actual situation after the high-pressure diversion tunnel is put into operation still needs corresponding monitoring methods to reveal.Therefore,it is judged whether the structural state is normal.
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28