660MW锅炉气力输灰系统的优化改造  被引量:4

Optimization and Transformation of Pneumatic Ash Conveying System in 660 MW Boiler

在线阅读下载全文

作  者:毛其东 崔方辰 刘永华 MAO Qidong;CUI Fangchen;LIU Yonghua(Shengli Guodian(Dongying)Thermoelectric Power Co.,Ltd.,Dongying 257100,Shandong Province,China)

机构地区:[1]胜利国电(东营)热电有限公司

出  处:《电力安全技术》2019年第9期53-55,共3页Electric Safety Technology

摘  要:分析某电厂660 MW机组在调试期间气力输灰系统的堵灰现象,指出是由省煤器堵灰、除尘器输灰不畅和灰斗料位高引起的。采取调整输灰逻辑、进料时间、输灰间隔和调整气化风温度等手段,解决省煤器和除尘器输灰系统堵灰问题,为同类设备运行提供了借鉴。The phenomenon of ash blockage in the pneumatic ash conveying system of a 660 MW power plant during commissioning is analyzed,which is caused by ash blockage of economizer,poor ash transport of precipitator and high level of dust hopper.Measures are taken to adjust the logic of ash transport,feeding time,ash transport interval and temperature of gasification air,which provides reference for similar equipment operation.

关 键 词:布袋除尘器 气力输灰系统 堵灰 

分 类 号:TM32[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象