检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴跃东 Wu Yue-dong(Yanzishan Coal Mine,Datong Coal Mine Group,Shanxi Datong 037037)
机构地区:[1]大同煤矿集团燕子山矿
出 处:《山东煤炭科技》2019年第11期50-52,共3页Shandong Coal Science and Technology
摘 要:为了加快综采工作面过断层速度,提高断层破碎带处顶板稳定性,保证工作面液压支架支护效果,降低机械设备故障率,大同煤矿集团燕子山矿通过技术研究,对8210工作面采取导硐法过F2断层,并采取了"注浆+恒阻锚索+迈步式锚索吊棚"等联合支护措施对导硐顶板进行支护,通过实际应用,取得了显著成效。In order to build up the cross-fault speed of fully mechanized mining face, improve the roof stability at the fault fracture zone, ensure the effect of hydraulic support and reduce the failure rate of mechanical equipment, Yanzishan Coal Mine of Datong Coal Mine Group used a pilot tunnel method to cross the F2 fault in the 8210 working face through technical research, and adopted "grouting + constant resistance anchor cable + step-by-step anchor cable hanging shed" and other combined supporting measures to support the roof of the pilot tunnel. Practical application shows that the results are remarkable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.149.213