检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:浦学荣 PU Xuerong(Guizhou Julong Project Investment Consulting Co.,Ltd.,Guiyang 550081,China)
机构地区:[1]贵州聚龙项目投资咨询有限公司
出 处:《水利建设与管理》2019年第11期17-21,共5页Water Conservancy Construction and Management
摘 要:在深厚覆盖层山区建水库,坝型多采用柔性坝,泄水建筑物宜采用岸边溢洪道,溢洪道边坡开挖、支护工程量大,投资高,对岸坡生态环境影响大。本文以贵州省施秉县黄金树水库为例,详细论述了溢洪道设计方案。经对比,决定采用溢洪道桩基方案。该方案投资少,施工简便、周期短,有利于工程尽快发挥效益和岸坡生态环境的保护,可在类似深厚覆盖层上的岸边溢洪道建设中推广使用。When the reservoir is built in the mountainous area with deep overburden layer, the dam type is mostly flexible dam. The spillway on the bank is suitable for the discharge building. The spillway slope excavation and support engineering quantities are large, the investment is high, and the impact on the ecological environment of the bank slope is great. Huangjinshu Reservoir in Shibing County of Guizhou Province is adopted as the support in the paper for discussing the design scheme of spillway in details. The spillway pile foundation scheme is adopted after comparison. The scheme has less investment, simple construction and short period, which is conducive for the project to exert benefits as soon as possible and protect the ecological environment of the bank slope. It can be popularized in the construction of the bank spillway with similar deep overburden layer.
分 类 号:TV651.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33