检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王振乾 芮新志 WANG Zhenqian;RUI Xinzhi(Tongling Nonferrous Share Fenghuangshan Mining Co.,Ltd.,Tongling Anhui 244000,China)
机构地区:[1]铜陵有色股份凤凰山矿业有限公司
出 处:《有色金属(矿山部分)》2019年第6期19-23,共5页NONFERROUS METALS(Mining Section)
摘 要:矿山在深部开拓时,平巷掘进遇到花岗闪长岩体,采用矿山常用的掘进爆破设计方案进行施工,效果很不理想。通过多次现场试验研究,调整优化了爆破设计方案,高效地穿过该段花岗闪长岩体。在改良掘进爆破设计的同时,确保了工程按时保质保量完成,为同类岩体掘进爆破施工提供了参考借鉴。Effects of the frequently-used design scheme of tunneling blasting are very unsatisfactory when the mine is deep exploited and encountering the granodiorite in laneway tunnelling.Through many field test studies,the blasting design scheme was adjusted and optimized,efficiently crossing this section of granodiorite,which not only improved the design of driving blasting,but also ensured the project completing timely quality and quantity,and even provided a good reference for driving blasting construction of similar rock mass.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185