斜拉桥主塔施工要点探讨  

Discussion on Main Points of Main Tower Construction of Cable-stayed Bridge

在线阅读下载全文

作  者:任永记 Ren Yong-ji

机构地区:[1]中交一公局第三工程有限公司

出  处:《建筑技术开发》2019年第21期64-66,共3页Building Technology Development

摘  要:随着我国现代化建设的不断推进,各种新的施工技术逐步引入建筑业,大大提高了建筑效率和施工速度。斜拉桥以其结构稳定、使用寿命长、工程安全性高等特点在我国桥梁建设中得到了广泛的应用。然而,由于斜拉桥的施工效果与预期效果存在偏差,最终影响到工程质量。因此,有必要对斜拉桥施工控制技术进行研究和分析,以保证施工质量。使桥梁运行安全可靠。With the continuous advancement of China’s modernization construction,various new construction techniques have been gradually introduced into the construction industry,greatly improving construction efficiency and construction speed. Cable-stayed bridges have been widely used in bridge construction in China due to their stable structure,long service life and high engineering safety. However,due to the deviation between the construction effect of the cable-stayed bridge and the expected effect,the quality of the project is ultimately affected. Therefore,it is necessary to conduct research and analysis on the construction control technology of cablestayed bridges to ensure the construction quality. The bridge runs safely and reliably.

关 键 词:斜拉桥主塔 下塔柱 横梁 

分 类 号:TU201.5[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象