检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘丽红 姚星明 Liu Lihong;Yao Xingming(Shanxi Institute of Technology,Yangquan,Shanxi 045000)
机构地区:[1]山西工程技术学院
出 处:《江西建材》2019年第11期114-115,共2页Jiangxi Building Materials
基 金:山西工程技术学院校级科研课题资助项目(校科[2018]15号)
摘 要:施工管理是工程管理的重要组成部分,在实际施工中经常出现施工管理落实不到位的情况。随着BIM技术在施工方面的应用,对施工进度进行层层把控,可以最大化的利用资源。论述利用BIM技术在钢筋下料方面的优化,进而解决施工问题,进一步阐述BIM技术在施工应用方面的意义。Construction management is an important part of engineering management, it often appears that construction management is not in place in actual construction. With the application of BIM technology in construction, the construction progress is controlled layer by layer to maximize the use of resources. This paper discusses the optimization of BIM technology in the underloading of steel bars, and then resolves the construction problems, and further expounds the significance of BIM technology in the application of construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74