检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张婷 燕樟林 许晶 陈颖萍 ZHANG Ting;YAN Zhang-lin;XU Jin;CHEN Ying-ping(Zhejiang Huadong Surveying Mapping And Geoinformation Co.,Ltd)
机构地区:[1]浙江华东测绘地理信息有限公司
出 处:《大坝与安全》2019年第4期32-34,共3页Dam & Safety
摘 要:为存储更多的电能,抽水蓄能电站选址大多位于高差较大的山区,通常植被覆盖率高,人类活动较少。水电设计趋于三维化,对真实地形的需求非常迫切,而传统的测量方法很难获取高精度的地形数据,特别在电站设计初期。介绍如何利用机载激光雷达技术开展地形测绘工作,并为后续三维设计提供基础三维地形。In order to store energy, most of pumped storage power stations are located in mountainous areas with high elevation difference, usually with high vegetation coverage and less human activities. As hydropower design tends to be three-dimensional, the demand for real terrain is very urgent, and traditional measurement methods are difficult to obtain high-precision terrain data, especially in initial design phase of hydropower station. This paper describes how to use the LiDAR in the topographic surveying and mapping to provide 3D terrain for the subsequent three-dimensional design.
分 类 号:TV221.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145