作 者:钟平 胡春林 张贵金[2] ZHONG Ping;HU Chun-lin;ZHANG Gui-jin(Wuling Power Corporation Ltd)
机构地区:[1]国家电力投资集团五凌电力有限公司,湖南长沙410004 [2]长沙理工大学,湖南长沙410114
出 处:《大坝与安全》2019年第4期42-48,67,共8页Dam & Safety
摘 要:针对东坪水电站厂房进水口存在的严重水流紊乱、吸入式漩涡等影响机组运行出力和安全的问题,采用三维数值模拟、水工模型试验等手段进行多方案对比研究,选择了缩短导墙长度、降低拦沙坎高度等方案,并实施水下切割。项目实施后厂房进水口流态得到明显改善,机组稳定性、效率得到明显提升,达到了预期效果。对类似电站导墙等建筑物的布置具有良好的借鉴作用,实施方式具有较强的现实意义。There were some safety problems existed in the water inlet of Dongping Hydropower Station,including severe turbulent flow and suction vortex. 3 D numerical simulation and hydraulic model tests were used to analyze and compare different solution schemes. The final decision was to shorten the length of diverting wall and reduce the height of sediment control sill. After implementation of the measures, the inlet flow regime, the stability and efficiency of the turbines have been significantly improved to desired results. It has a good reference for similar hydropower stations.
分 类 号:TV698.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28