摘 要:电气调试技术虽然已经较为成熟,但受设计、安装、设备、工况等因素的影响,发电厂调试过程中仍会出现各类问题。以某电厂百万容量大型机组为例,总结分析了调试中的若干问题、故障及相关调试处理方法,并通过相关试验检查,验证了调试处理方法和故障诊断的有效性、正确性,为相关的调试工作提供参考。Electric debugging is a mature technology.Due to design,installation,equipment,and working condition,there still has several problems.In this paper,large-sized units was taken as examples and several problems,faults,and solutions were summarized and analyzed.The effectiveness of methods and correctness of fault diagnosis were tested and proved,providing reference for electric debugging work.
关 键 词:电气调试 零序差动保护 厂用电切换 转子接地故障