检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨帅吉 YANG Shuai-ji(The General Contracting Company of CCCC Fourth Harbor Engineering Co.Ltd.,Guangzhou 510290,China)
出 处:《工程建设与设计》2019年第23期251-253,共3页Construction & Design for Engineering
摘 要:基于公路工程BOT+EPC工程总承包项目与传统施工承包项目在组织模式与资源整合上的不同特点,从EPC总承包人的角度介绍项目实施阶段设计与施工相关的技术管理工作内容、管理措施与注意事项,提出加强项目设计与施工环节协调性的管理措施。Based on the different characteristics of the organization model and resource integration between BOT+EPC project general contracting projects and traditional construction contracting project for highway engineering,from the perspective of EPC general contractor,this paper introduces the content,management measures and matters needing attention of technical management related to design and construction in the implementation stage of the project,and puts forward management measures to strengthen the coordination between design and construction links of the project.
分 类 号:U415.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117