Analysis and Numerical Simulation of Hydrofracture Crack Propagation in Coal-Rock Bed  被引量:1

在线阅读下载全文

作  者:Yiyu Lu Chenpeng Song Yunzhong Jia Binwei Xia Zhaolong Ge Jiren Tang Qian Li 

机构地区:[1]State Key Laboratory of Coal Mine Disaster Dynamics and Control,Chongqing University,Chongqing 400030,China

出  处:《Computer Modeling in Engineering & Sciences》2015年第5期69-86,共18页工程与科学中的计算机建模(英文)

基  金:jointly supported by 973 Program(NO.2014 CB239206);PCSIRT(NO.IRT13043);the National Science Foundation of China(NO.51374258,NO.51474158);the Open Projects of State Key Laboratory of Coal Mine Disaster Dynamics and Control(Chongqing University 2011DA105287-FW201412).

摘  要:In underground coal mines,hydrofracture can cause the increase of breathability in the fractured coal bed.When the hydrofracture crack propagates to the interface between the coal bed and the roof-floor stratum,the crack may enter roof-floor lithology,thus posing a limit on the scope of breathability increase and making it difficult to support the roof and floor board for subsequent coal mining.In this work,a two-dimensional model of coal rock bed that contains hydrofracture crack was constructed.Then an investigation that combines the fracture mechanics and the system of flow and solid in rock failure process analysis(RFPA2D-Flow)were carried out to study the failure mechanism at the interface between rocks and coals,and critical water pressure that hydrofracture crack propagates.The results indicated that the main factors that affect the direction of hydrofracture crack propagation are the angle of intersection between coal-rock interface and horizontal section,horizontal crustal stress difference,tension-shear mixed crack fracture toughness in coal-rock interface and differences in elasticity modulus of coal-rock bed.The possibility of crack directly entering coal-rock interface would increase with the increase in angle of intersection or horizontal crustal stress difference.The trend that crack propagates along the coal-rock interface will become stronger with the decrease of the fracture toughness at the coal-rock interface and the increase of the elasticity modulus difference between the coal bed and the roof strata.The results of this study was to put forward a method of controlling hydrofracture crack,optimize the fracturing well location provides a certain theoretical basis.

关 键 词:HYDROFRACTURE CRACK PROPAGATION coal-rock interface COAL MINE 

分 类 号:TD3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象