锡盟±800 kV换流站工程构支架组立施工质量问题解决途径探索  

Exploration on Solution to Construction Quality Problems of Structure Supports and Trusses of ±800 kV converter station in Xilinguole League

在线阅读下载全文

作  者:张锴 ZHANG Kai(Economic Research Institute of State Grid Zhejiang Electric Power Company,Hangzhou 310008,China)

机构地区:[1]国网浙江经研院

出  处:《电工技术》2019年第22期72-73,76,共3页Electric Engineering

摘  要:文章对锡盟±800 kV换流站工程构支架组立施工过程中发生的多起关于质量问题的事件进行浅析,并提出一定的防范措施,从而为其他换流站工程构支架组立施工提供理论参考。This paper briefly analyzes several incidents related to quality problems during the construction of structure supports and trusses in±800 kV converter station project in Xilinguole League,and puts forward some preventive measures,so as to provide theoretical reference for the construction of structure supports and trusses of other converter stations.

关 键 词:构支架 汇流母线塔 防范措施 

分 类 号:TM7[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象