检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆波 顾洪宾[1] 姜昊[1] LU Bo;GU Hongbin;JIANG Hao(China Renewable Energy Engineering Institute,Beijing 100120,China)
机构地区:[1]水电水利规划设计总院
出 处:《水力发电》2019年第12期12-16,共5页Water Power
摘 要:为响应近年来国家对小水电站整顿的政策要求,一些小水电站的退出拆坝被提上了议程。我国针对大坝建设等工程项目制定了完善的环境影响评价体系,但拆坝工程则尚未形成规范的管理程序和技术标准。通过对美国拆坝工程的案例调研,分析其拆坝原因、法律依据、环境评估履行程序和工作要求,并结合我国水电环境管理特点,研究提出了小水电站拆坝工程的环境评估流程和评估要点,以为后续相关工作及标准制定提供参考。In response to state policy requirements for the rectification of small hydropower stations in recent years,some small hydropower stations may be demolished.China has developed a complete environmental impact assessment system for dam construction projects,but the standardized management procedures and technical standards for dam removal have not yet been formed.Based on the case studies of dam removal in United States,the reasons and legal basis of dam removal,and the procedures and requirements of environmental assessment in United States are analyzed.Combining with the characteristics of hydropower environmental management in China,the process and key points of environmental assessment of small hydropower dam removal project are proposed to provide reference for follow-up works and standard formulation.
分 类 号:X820.3[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.176.160