蒲石河抽水蓄能电站水库冰情研究  被引量:5

Study on Reservoir Ice Regime of Pushihe Pumped-storage Power Station

在线阅读下载全文

作  者:赵海镜[1] 刘书宝[1] 张艳红 ZHAO Haijing;LIU Shubao;ZHANG Yanhong(PowerChina Beijing Engineering Corporation Limited,Beijing 100024,China;Longhua County Water Bureau,Chengde 068150,Hebei,China)

机构地区:[1]中国电建集团北京勘测设计研究院有限公司,北京100024 [2]隆化县水务局,河北承德068150

出  处:《水力发电》2019年第12期90-94,共5页Water Power

基  金:中国电力建设股份有限公司项目(DJ-ZDZX-2016-02)

摘  要:蒲石河抽水蓄能电站地处严寒地区,冬季水库会发生结冰现象,为保障电站冬季运行,有必要开展电站水库冰情研究。为此,采用资料分析和数值模拟方式,总结了电站水库冰情的形成及消长规律,分析了电站机组运行和水库冰情之间的关系,给出了该电站建议的冬季运行方式,提出了电站水库冬季最大冰厚的计算方法,模拟了电站水库冬季结冰过程,研究成果可供同类工程借鉴。The Pushihe Pumped-storage Power Station is located in cold area,so it is necessary to study the reservoir ice regime for safeguarding the safe operation of station in winter as reservoir icing.By data analysis and numerical simulation,the formation and growth law of reservoir icing condition of station are summarized,the relationship between unit operation and reservoir icing regime is analyzed,and the winter operation mode of power station is recommended.The calculation method of maximum ice thickness of reservoir in winter is put forward as well as the freezing process in winter is also simulated.The research results can be used for reference to similar projects.

关 键 词:水库冰情 最大冰厚 数值模拟 运行方式 蒲石河抽水蓄能电站 

分 类 号:P338.4[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象